US$ 115.99
Pay in 4 interest-free payments of $11.24 Learn more
216 and 230 being produced
Once Found in every Locomotive depot and at most stations too
Two pairs of 12 way pluggable connectors
Designed and manufactured in Great Britain One-Touch DCC™ is a brand new way of instantly controlling your new signals or accessories - NO programming CV codes etc
It is not recommended to use a metal coupler directly on a metal surface or in a metal draft gear box to avoid the possible electrical crossover or shorting that may cause damage
4P-020-012 GWR Toplight Mainline City Lined Crimson All Third 3902 Set 1 Weathering 216 and 230 being producedThe first order for these coaches was placed in 1915 but, due to the First World War, they were not built until 1920. The second batch was completed in 1921. Six sets of coaches were produced with each set comprising six coaches. The coaches were close coupled and constructed with a steel body rather than the traditional wooden panelling. Due to the restrictive loading gauge of the London Underground tunnels, the carriages are 7 inches lower than
US$ 115.99
US$ 39.95
US$ 115.99
US$ 159.00